Making history

U.S. Air Force Senior Airmen Kyle Burns, a radar airfield weather systems technician from the 31st Operations Support Squadron, looks at processed data from the Digital Airport Surveillance Radar at Aviano Air Base, Italy, Nov. 13, 2019. The DASR provides real time location, altitude and range for all aircraft within a 60 mile radius. (U.S. Air Force photo by Airman 1st Class Ericka A. Woolever).

PHOTO BY: Airman 1st Class Ericka A. Woolever
VIRIN: 191113-F-ZX177-1081.JPG
FULL SIZE: 6.02 MB
Additional Details

CAMERA

NIKON D850

LENS

24.0-70.0 mm f/2.8

APERTURE

28/10

SHUTTERSPEED

10/1250

ISO

400

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dma.mil/Services/Visual-Information/References/Limitations/, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.